EME Process
Electro Mechanical Engineering (EME)
EME Stands for
Electrical and Mechanical Services in the building which covers
Air-conditioning & Ventilation, Electrical & Communication, Fire
Protection and Detection, Sanitary and Vertical Transportation system. These
services are to be ensured with the help of proper coordination from other
departments such as PMD, Design, SCM, Operation, Customer Service, Sales and
Maintenance. These inter-departmental dependencies are further explained in the
following:
1.
BUSINESS DEVELOPMENT
During the land acquisition
phase, EME department supplies preliminary EME costs to the Business
Development department upon their requirements.
The following data is
required from BD team to provide accurate costs:
·
Land Area
·
Type of Building
·
No. of Floors
·
No. of Apartments Per
Floor
·
Apartment Size
·
Lift
o Number, capacity and specification of lift i.e whether passenger
or stretcher lift
o Brand of Lift e.g Mitsubishi / Schindler / Toshiba / OTIS
o Speed of Lift
o MR / Machine Room Less
o Emergency Rescue Device Provided or not
·
Generator
o Capacity of Generator Whether: Full / Partial Back-up
o Brand of Generator FG Wilson / Vibropower
·
Air conditioner
provided or not
Special amenities if
any: Swimming Pool / Gymnasium / Pool Room / CCTV /Video Intercom
2.
PROJECT MANAGEMENT OFFICE (PMO)
Attend
coordination meetings with Architects / Consultants and P & C department
regarding preliminary design, Architectural, Structural, and Electrical &
Plumbing drawings. During Architectural Drawing Development, EME Department
provides the following observations:
·
Load calculation and size
of sub-station and generator
·
Checking the space
requirements for sub-station and generator room
·
Checking of earthing
boring position
·
Checking of AC
Indoor and outdoor location considering GAS pipe route and condense
water drain line and future maintenance facility,
·
Checking of all types
of EME duct provision (GAS line, fire duct, electrical duct, sanitary duct),
·
Checking of lift core
size, overhead, machine room size, pit depth
·
Checking underground
water reservoir and over-head water reservoir size.
·
Checking of
drainage system of basement.(Pit Size, Location)
·
Checking of
ventilation provision for basement.
·
Checking toilet and
kitchen exhaust provision. Also kitchen hood provision.
·
Checking of sub-
distribution board, communication junction box location, switch socket location.
·
Checking of geyser location.
·
Checking of solar
panel location and arrangement at roof.
·
Checking the lightning
arrestor location, down conductor path.
·
Checking of fire
hydrant box location and size.
·
Checking of pump room
location and size.
·
Checking of water
fountain requirements.
·
Checking of
communication control room location.
·
Preparation BOQ
after getting design & drawing from the Consultant / Architect.
·
Provide EME
construction work schedule.
·
Requirements given to
P&C department during construction period if any modification required in
design / drawing.
3.
CONSTRUCTION OPERATION
·
After receiving final
design / drawing from PMD department, initiative is taken to mobilize EME
construction work
·
Selection of labor contractor
for internal electrification works with rate schedule
·
Supply necessary
drawings to site engineers /projects & contractor
·
Provide necessary
guideline to engineers & contractors about work procedure & workmanship
·
Supervision of
internal electrification work.
·
Supervision of
installation, testing & commissioning work of EME equipment including deep
tube well, plumbing work after selection of vendors.
·
Weekly meeting with
site personnel & respective contractor’s regarding bottleneck of progress
of work
·
Routine site visit to
monitor the progress of work
·
Giving decision,
necessary documents & assistance to site personnel as and when required
·
Coordination meeting
with Consultant / Architect during construction period regarding design /
drawing.
·
Attend management
meeting.
4.
PROCUREMENT. & SUPPLY
CHAIN MANAGEMENT
·
Give requisition of
materials to Procurement & SCM and communicate with them about supply of
the materials.
·
The following items
are checked before the requisition is placed.
o Total estimated quantity
o Total quantity delivered
o Present quantity require
·
Give technical
schedule / specification, list & BOQ of all EME equipment for selection of
materials & vendors such as:
o Sub-station
o Generator
o Lift
o Fire Fighting System
o Fire alarm system
o Electrical geyser
o Water purification system
o Ventilation system
o Switch & socket
o LT cable
o Circuit Breaker
o Water Transfer Pump
o Submersible Drainage Pump
o Sub Distribution Board
·
Checking of Technical
specification of equipment & material after receiving CS from Procurement
& SCM (Quotation collection & CS done by Procurement & SCM)
·
Coordination meeting
with Procurement & SCM & different vendor regarding technical issue
& give necessary instruction if required.
·
Final checking of
technical part after selection of vendor & material
·
Give observation &
necessary assistance to Procurement & SCM if required
·
Further checking of
Technical part of work order before issue.
·
Checking of L/C
documents of EME part for imported item
·
Checking & giving
approval to requisition before purchase of material.
·
Coordination meeting
with procurement & SCM and site personnel for smooth supply of material.
·
Submission of
contractor’s bill to accounts department after checking.
·
Provide necessary
assistance to A/C department as and when required
5.
SALES & MARKETING
·
Provide necessary
drawings / documents as and when required
·
Provide EME costing if
required
·
Provide necessary
assistance as per requirements.
6.
AFTER HANDOVER
MAINTENANCE
·
Give necessary
preliminary guideline to maintenance team.
·
Give necessary support
& assistance to maintenance team.
·
Give technical
solution to maintenance team if any problem arises.